Search GPUs, workloads, projects…
Sign in

Priority & Preemption

Run:ai policy sandbox

Critical AI admission · Temporary GPU reclamation · Quota-safe restoration

Critical

P100

Business-essential AI services with the strongest admission and capacity claim.

Never preempted

Reclaims lower priorities

High

P90

Important production training and inference that requires stable capacity.

Protected in this policy

Ahead of Normal and Development

Normal

P80

Standard business workloads that may checkpoint and resume when policy permits.

Policy-controlled

After Development

Development

P70

Experimentation and non-production work with flexible interruption windows.

Preemptible

First reclaim candidates

Incoming critical workload

critical-fraud-response
GPUaaS Offering
ocp-sg-core-02
Review the plan, then run it

Reclaim policies

Consider flexible development workloads first.

Checkpoint and pause standard workloads if needed.

Never pause work below a project's guaranteed minimum.

Free before

1 GPUs

Healthy H100 capacity

Capacity shortfall

3 GPUs

Must be reclaimed

Planned reclaim

4 GPUs

1 workload selected

Project quota after

6 / 8

2 GPUs already used

Critical workload can be admitted

  1. 1.Admission allowed: 2 used + 4 requested = 6 of 8 physical GPUs.
  2. 2.1 GPU is free, so 3 more must be reclaimed from lower-priority workloads.
  3. 3.dev-pipeline-test selected; Development is considered before Normal, then larger and newer workloads first.
  4. 4.Whole-workload preemption preserves every project's guaranteed minimum; Critical and High workloads remain protected.
  5. 5.Reclaimed workers are preferred for placement, avoiding unrelated free capacity where possible.

GPU worker capacity

Five NVIDIA H100 workers · 40 physical GPUs · 39 allocated in this scenario

Critical incomingNormalDevelopment

sg02-h100-c01

0 free before

8 allocated · Healthy

sg02-h100-c02

0 free before

8 allocated · Healthy

sg02-h100-c03

0 free before

4 GPUs marked for reclamation

sg02-h100-c04

0 free before

8 allocated · Healthy

sg02-h100-c05

1 free before

7 allocated · Healthy

Temporary reclaim lifecycle

1 · Admit critical

6 / 8 project GPUs after admission

2 · Checkpoint & pause

30s grace · 1 selected

3 · Run critical

Waiting for execution

4 · Restore capacity

After critical work completes

Workload policy decisions

Critical request: Queued · plan ready
WorkloadPriorityProject / guaranteeWorkerGPUsPolicyState
critical-payment-guardCriticalFraud DetectionMinimum 4 GPUssg02-h100-c014ProtectedRunning
high-risk-scoringHighThreat IntelligenceMinimum 4 GPUssg02-h100-c014ProtectedRunning
normal-vision-tuningNormalComputer VisionMinimum 4 GPUssg02-h100-c024PreemptibleRunning
normal-vision-evaluationNormalComputer VisionMinimum 4 GPUssg02-h100-c024PreemptibleRunning
dev-jupyter-explorationDevelopmentAI DevelopmentMinimum 0 GPUssg02-h100-c034PreemptibleRunning
dev-pipeline-testDevelopmentAI DevelopmentMinimum 0 GPUssg02-h100-c034PreemptibleWill pause
normal-risk-backtestNormalRisk AnalyticsMinimum 8 GPUssg02-h100-c048PreemptibleRunning
normal-recommendation-canaryNormalRecommendation EnginesMinimum 0 GPUssg02-h100-c054PreemptibleRunning
dev-data-prepDevelopmentAI DevelopmentMinimum 0 GPUssg02-h100-c053PreemptibleRunning

Decision and restoration log

Admission allowed: 2 used + 4 requested = 6 of 8 physical GPUs.

1 GPU is free, so 3 more must be reclaimed from lower-priority workloads.

dev-pipeline-test selected; Development is considered before Normal, then larger and newer workloads first.

Whole-workload preemption preserves every project's guaranteed minimum; Critical and High workloads remain protected.

Reclaimed workers are preferred for placement, avoiding unrelated free capacity where possible.

Simulation only: no NVIDIA Run:ai or OpenShift connection. Reclamation uses whole-workload checkpoint-and-resume, never partial GPU removal. This isolated scenario does not change fleet inventory, saved approvals, project quotas, or deployed workloads.